The Two More Mission app

Your coaching.
In your pocket.

The app tells you what to do and when, and shows how I measure your progress. Every screen on this page is the real app, with example numbers in it.

The app’s home screen: capability rating 69 out of 100, today’s session, food and check-in

Opens on today, all of it

It tells you what to lift, records what you did, and shows you whether it’s working.

Get the highlights

Everything, one tap apart

Seven tools, built for this coaching. Swipe through, or read the detail further down.

  • Today’s session in the app

    Today’s session, written for you

    The session you’re due, with loads worked out from last time.

  • Logging a set: load, reps and RPE

    Every set, logged

    Weight, reps and effort, with last time’s numbers right above.

  • The capability rating screen

    One rating out of 100

    Strength, conditioning and consistency, against your own start.

  • The round timer

    A round timer that keeps ringing

    Boxing, Muay Thai and MMA presets. Works with the screen locked.

  • The food screen

    Food against your targets

    Scan the barcode, photograph the label, or search UK brands.

  • The Recover screen

    A daily recovery routine

    Ten to fifteen guided minutes, built around the day’s session.

  • The morning check-in

    Two-minute check-ins

    Bodyweight, resting heart rate, sleep, water and steps.

12weeks of training between your first test and your retest
100point capability rating, measured against your own start
2rounds of testing: week one and the final week
The app’s home screen: capability rating 69 out of 100, with today’s session, food and check-in

Home

Everything for today, on one screen

The app opens on where you stand: your capability rating, today’s session, the calories you have left, whether you’ve checked in, and how many sessions you’ve logged this week. Tap any of them to go there.

  • Your rating out of 100, with the change this week
  • Today’s session, food left, check-in and the week, in four tiles
  • A flag on the one thing worth acting on, before it stalls you
Today’s session in the app: lower strength, block two

Your programme

Today’s session, written for you

One tap from home takes you to the session you’re due. Each exercise lists sets, reps, rest and target effort, with the load worked out from what you lifted last time.

  • Your sessions for the week, in order, one tap apart
  • Target load and reps for every exercise, updated as you progress
  • A coaching cue on every movement: what it’s for, what to feel, when to stop
Logging a set of trap bar deadlifts: load, reps and RPE

Workout tracking

Log it while you’re still stood there

Log weight, reps and how hard it felt, set by set. The effort scale offers only the range that exercise is prescribed at, so the number means something, and the app uses it to decide whether you add weight or a rep next time.

  • Load in kg, reps, and effort (RPE) for every working set
  • Last time’s numbers and this week’s target shown above the logger
  • Rest timer starts itself when you save a set
Capability rating of 69 out of 100, charted week by week

Progress

One score out of 100

The app charts what you log against what the programme expected. Strength, conditioning and consistency make up one rating, and the app flags anything drifting before it stalls you.

  • Capability rating, updated as you log
  • Every tracked lift charted against its plan line
  • Plain-English flags on what needs attention this week
A kick being checked mid-fight in the cage

For fighters

Fight training, built in.

Boxing, Muay Thai and MMA rounds, a bell you can hear with the phone locked in your pocket, and conditioning tested the same way every block.

The round timer set to twelve three-minute rounds

Round timer

Built for fight training

Boxing, Muay Thai and MMA presets, or set your own rounds and rest. The bell keeps ringing with the phone locked in your pocket, so it works on the bag, on the pads, or in sparring.

  • Custom round length, rest and number of rounds
  • Keeps timing with the screen off
  • Rest timer and timed exercises run on the same clock
Food screen: calories left today, with protein, carbs and fat against target

Nutrition

Food against your targets

Scan the barcode or search the brands you buy, and the app counts it against today’s targets. I set those targets around what you already eat, so they hold up through a bad week.

  • A barcode scanner built into the app
  • No barcode? Photograph the nutrition label and it reads the numbers for you
  • UK products and brands first; anything you add yourself is saved for next time
  • Log a serving, the grams, or the whole pack, with one tap to repeat a recent food
  • Calories, protein, carbs and fat against targets set for you
The Recover screen: a 14-minute routine for a lower strength day

Recovery

Ten to fifteen minutes, every day

A daily mobility routine, rest days included. It matches today’s session, or preps you for the next one on a rest day. A timer runs each move and gives you a few seconds to read it first, so you follow along.

  • Follows the day’s training: lower body, upper body, power or conditioning
  • Guided move by move, or tick it off if you did it on your own
  • Rate soreness, energy and stress in five seconds, and keep the streak going
  • Counts towards your consistency score
The morning check-in screen with bodyweight and resting heart rate

Check-ins

Two minutes that keep it honest

Log bodyweight, resting heart rate, sleep, water and steps, then send the week to me in one tap. I read it next to your training data before I change anything.

  • Takes two minutes
  • Charted over weeks, so one bad night shows as one bad night
  • I use it to set next week
The app’s testing week page: what the week is for, and its one rule

Where it starts

The testing week

Your first week is all testing: sessions that record where you are. The app walks you through each one: what it measures and how to run it.

I measure everything afterwards against these numbers.

And

Accountability, built in

Send a form-check video from the exercise you’re on, and message me between check-ins when something hurts or doesn’t make sense.

Form checks

One tap from any exercise opens a message to me with the lift already named. Attach the video and send.

Direct line

Message me from the coach tab without waiting for the weekly check-in.

Works with no signal

The app saves to your phone first, so it works in a gym with no signal. It syncs when you’re back online, and you can export a copy any time.

See it with your own numbers in it

The app comes with the coaching.

I deliver the coaching through it, and I don’t sell it on its own.

Apply for coaching